Weaving Kreta Ayer
Urban Conservation and Regeneration Strategy
Group 3 - AC5003 AY 2022/2023
NEW
KRETA AYER
AVENUE
The New Kreta Ayer Avenue starts from the proposed open plaza adjacent to the Buddha relic temple and ends on the other side by the Pearl Hill, therefore connecting a big stretch of various spaces that enables activities such as sports, play, entertainment, shopping and business. Along this route are many newly proposed urban landscape elements such as ramps, staircases and a new garden bridge that allows a transition that is interactive and well connected.
This Main Avenue is linked within and to the other parts of the area such as the proposed community area for HDB residents and to the back lanes of the shop houses.
The addition of ramp/staircase along the Sago Lane enables direct connection to the roof level of the Chinatown Complex HDB, activating the public housing into the new urban development.
The circulation also reinstate the old walkway that once grazed the area.